Kuzeystar Shipyard Rock Dredging Project

In the area where the new dry dock will be located at Kuzeystar Shipyard, the rock breaking and the dredging works have successfully completed up to a depth of 13 meters with the using of hydraulic underwater breakers and special rock buckets in the 4500 m2 hard rock floor area located on the sea floor.