Desan Shipyard DredgingProject
In the area where the new dry dock is located within the Desan Shipyard, approximately 100.000 m3 sea bottom dredging works have been performed.
55.000 m3 of this material is hard rocky ground, 45.000 m3 of clay and slime material.