KKTC Drinking Water Supply Project
Within the scope of the KKTC drinking water supply project, which is named as the project of the century, our coastal approach pipeline construction works have been completed to a large extent. Turkey and the KKTC side approach the shore pipeline installation was completed. The backfill of the pipelines is continuing.